February 2012 Volume 9, Number 1
Cover Story
LOTO Becomes Wind Industry’s Next Hot Topic
With the formation of a task force, the industry sharpens its focus on lockout/tagout procedures.
Project Profile
Lower Snake River Project Benefits Struggling Community
Puget Sound Energy developed its Lower Snake River wind project, located in southeastern Washington, in order to fulfill the state’s renewable portfolio standard.
Spotlight
Challenges Persist For Pioneering Wind State
Washington was once a thriving state in which to build wind projects. However, its productivity has slowed due to several factors.
Industry At Large
How To Avoid Gridlock When Integrating Wind Generation
Traditionally, utility-scale electric power systems were designed to accommodate active power generation at the transmission level, not the distribution level. In essence, the one-way load flow is becoming a two-way street.
Connect Data Points To Gain Increased Reliability
By connecting data points already being collected by turbines, owners and operators can get a greater understanding of real wind turbine reliability.
Marketplace
Reducing Liability Risk During Transportation
As the overall size of turbines increases, so does the likelihood of an accident. If a mishap occurs, how protected is your business against loss?

|
|
 If you haven't subscribed to North American Windpower, you're missing these stories and more. Subscribe today to start receiving your copy of North American Windpower.
|
|
|